范文站 > 合同范文 > 建设工程合同 > 房屋拆迁合同(25)

房屋拆迁合同(25)

2011-09-17 14:39 来源:范文站 人气(0) 范文站fanwenzhan.comRSS订阅 

16.附加条款:主机的保养——乙方应在甲方验收后,提供免费及定期对_________保养服务一年,每_________个月派员一次维护正常运行。
本合同按双方所签日期生效。
甲方(盖章):_________        乙方(盖章):_________
法定代表人(签字):_________     法定代表人(签字):_________
_________年____月____日        _________年____月____日
签订地点:_________          签订地点:_________

附件

this contract for project of installing main engine is made on_________, by and between _________ company ltd. (here- inafter called party a) and _________ company ltd. (hereinaftercalled party b).
1. name of installation work: _________.
2. location of installation work: party a's_________in port a.
3. scope of installation work: as specified in the drawingsand statement attached.
4. time limit for completion:
  the installation work shall cordinate with the construction of _________ in party a, and shall be completed, including thetrial run for _________, within _________days after the completion of _________.
5. total price of installation work:_________u.s. d only.
6. payment terms of installation work:
  first installment:
  party a shall pay to party b fifteen percent of the total pricefor installation work, i.e._________u.s.d only, when thiscontract comes into effect.
  second installment:
  party a shall pay to party b fifteen percent of the total pricefor instalatiorn work, i.e_________u. s. d. only, at the commencement of construction installation.
  third installment:
  party a shall pay to party b ten percent of the total pricefor installation work, i.e._________u. s. d. only, duringthe installation of pipes.
  fourth installment:
  party a shall pay to party b forty percent of the total pricefor installation work, i.e._________u. s. d. only, at thetime when the main equipment arrives at the site.
觉得本文对您有用,想收藏下来!方法很简单:请点击-〉