      (5)telephones, fire-fighting equipment and first-aid equipment until the whole works have been taken over.
      (6)sanitary and canteen facilities for the use of persons engaged in the works.
    3. the contractor shall observe all safety and other regulations imposed on the site by local laws.
    4. the contractor shall at all times keep the owner's property and the adjoining premises, driveways and streets free of construction materials and rubbish caused by the works, and at the completion of the works shall remove all remaining materials from and about the premises and shall leave the site and plant safe, clean and ready for use.
article 8- inspection
    1. the contractor will supply at his own cost food, transprot and all necessary facilities for all his own personnel.
    2. on signing the contract, the contractor shall appoint a project manager who will represent the contractor at all times be present at the site during working hours. all communications issued by the owner to the project manager shall be binding as if given to the contractor.
    3. the owner may request the removal and replacement of any person employed by the contractor on the site if such person is in the owner's opinion guilty of misconduct, incompetence or negligence.
article 9- inspection
    1. the contractor shall be responsible for all losses of or damage to the plant before final acceptance, and shall make good al such loss or damage at the cost of the contractor and to the reasonable satisfaction of the owner provided, however, in the case of loss or damage to the plant arising from or occasioned by causes for which the contractor is mot responsible under the contract, the same shall be made good by the contractor but at the cost of the owner, if the owner so directs.
    2. the contractor shall indemnify the owner in respect of all damage and injury occurring before the issue of the final acceptance certificate to any property and person and against all actions, suits, claims, demands, charges and expenses arising in connection therewith which shall be occasioned by the negligence of the contractor or any of his sub-contractors or by defective design, materials or workmanship but not otherwise.