article 5 guarantee
  5.1 part b guarantees that the documentation supplied shall be of the latest technological achievement within the valid period of the contract and shall be exactly identical with the documentation currently used by part b.
  5.2 part b guarantees that the documentation supplied shall be complete, correct and legible.
article 6 tax and duty
  6.1 all taxes, customs and other duties in connection with the performance of the contract arising outside the part a side shall be borne by part b.
  6.2 all taxes, customs and other duties in connection with the performance of the contract arising inside the part a side shall be borne by part a.
article 7 trademark
  7.1 part a shall have the right to use the part b trademark and serial number of contracted products. part a shall label the trademark smith - portla co, ltd. on the contracted products so produced.
  7.2 nameplates, quotations, technical specifications, advertisement, instruction manuals, samples of the contracted products manufactured by part a shall all be labelled with the name of part a.
article 8 packing
  8.1 packing shall be in the form of strong wooden case (s) suitable for long voyage and well protected against dampness, moisture, shock, rust and rough handling. the seller shall be liable for any damage to the goods and extra expenses due to improper packing, inadequate or improper protective measures.
  8.2 the package number, measurements, gross weight, net weight, the words "keep away from moisture"and the following shipping marks shall be printed with fadeless paint on each package:
    (1)part b/part a 12v - 400zc
    (2)part b/part a12v- 600zc
  8.3 packing list in duplicate indicating gross and net weight,measurements and quantity of each item is included.
article 9 force majeure
  9.1 should either party of the contract be prevented from implementing the contract by such cases of force majeure as war, serious fire, flood, typhoon and earthquake, or other events confirmed by both parties, the time for implementing the contract shall be extended by a period equal to the effect of such force majeure.