if the supplier requests the buyer for review by the supplier of thetechnical documents prepared by the buyer in accordance with appendix 7-1(scope of works and supply)hereto, the buyer shall submit the relevanttechnical documents requested by the supplier to the supplier for review.if supplier considers necessary, the supplier is entitled to assign anddispatch its engineer(s)to the buyer's design office to give technicaladvice and instructions. such reviews by the supplier do not relieve the buyer from the buyer'sresponsibilities in relation to correctness or appropriateness of thetechnical documents prepared by the buyer. article 22. supply and delivery 22.1 supply of equipment subject to article 14.2 (advance payment bond)hereof, the suppliershall procure and supply all the equipment in an expeditious and orderlymanner. 22.2 delivery 22.2.1 the equipment shall be delivered on fob _________ ports basisin accordance with incoterms. the supplier shall complete the delivery of the equipment in _________basic lots in accordance with the final delivery schedule specified inarticle 22.2.3 hereof. in addition to the above basic lots the suppliershall deliver the following lots, however these additional lots shall notbe considered as one of the above basic lots. (a)foundation templates and anchor bolts of the equipment shall bedelivered in _________ lot(s)within _________ months from the effectivedate. (b)catalyst(s), chemical(s)and/or lubricant oil which are to besupplied by the supplier in accordance with appendix 7-1 (scope of worksand supply)hereto shall be delivered in _________ lot(s)not later than_________ months before the commencement of the commissioning. (c)_________ the total gross weight of the equipment is approximately _________metric tons and the total volume is approximately _________ cubic meters.the port(s)of shipments are _________. the port of destination is_________.