    23.14 if the buyer considers that the inspection of the equipment bydisassembling thereof is necessary, the buyer may perform suchdisassembling inspection, provided that the buyer and the supplier shallmutually agree to such inspection in advance, the supplier's engineer(s)may witness such inspection and the buyer shall perform such inspection inaccordance with the relevant technical documents supplied by the supplierat that time.however, in any event the following equipment shall not bedisassembled:;instrument equipment;electrical equipment;rotating equipment; computer.
    23.15 after the open-package inspection, the buyer shall properlyre-pack and store the equipment in accordance with the instructions of thesupplier's engineer(s).
    23.16 the open package inspection shall not release the supplier fromdefect liability under article 27 (defect liability)hereof.
article 24. erection and precommissioning
    24.1 the erection and the precommissioning shall be carried out bythe buyer with the supplier's technical services in accordance withappendix 7-5 (the supplier's engineer's technical services and workingconditions).
      the supplier shall provide the technical services on theerection and the precommissioning of the contract plant. the supplier'sengineer shall give detailed explanation of methods and requirements ofthe erection and the precommissioning to the buyer's personnel who aretaking part in the erection and the precommissioning. the importanttechnical explanation shall be given in written form.
      each party shall nominate within sixty (60)days before thebeginning of the erection, one general representative to deal with allmatters in connection with the works at the contract plant during theperiod from erection up to the acceptance of the contract plant. suchsupplier's general representative shall arrive at the contract plant_________ day prior to the beginning of the erection. the generalrepresentatives of both parties shall fully cooperate to prepare workingschedule and to analyze the problems and difference, which are to beclarified and solved through friendly consultation. further descriptionwith regard to the general representatives of the buyer and the supplierat the contract plant are referred to in appendix 7-5 (the supplier'sengineer's technical services and working conditions)hereto.