范文站 > 合同范文 > 技术合同 > 非专利技术转让合同(63)

非专利技术转让合同(63)

2011-09-17 14:40 来源:范文站 人气(0) 范文站fanwenzhan.comRSS订阅 

      22.2.2 within _________ months after the effective date, the suppliershall submit to the buyer;
        (a)the preliminary delivery schedule in six (6)copies whichspecifies the contract number, item number, name of the equipment,quantity, total price, approximate total gross weight, approximate totalvolume, time of each shipment, shipping port, name of dangerous or inflammable equipment, and
        (b)approximate dimensions (length, width and height)of theover-sized or over-weighted equipment.
      the maximum limit of the weight of each inseparable integratedequipment is _________ metric tons while the maximum limit of measurement is_________ x _________ x _________ meters.
      22.2.3 not later than _________ months before the first delivery, thesupplier shall submit to the buyer,
        (a)the final delivery schedule in six (6)copies, which specifies thecontract number, despatch number, item number, name of the equipment,quantity, total price, approximate total gross and net weight, approximatetotal volume, approximate dimensions (length x width x height)and volumeof each packaging case, time of each shipment, identification of basiclots and additional lots, shipping port, name of dangerous or inflammableequipment and imo no., and
        (b)pecial requirements and precautions to be taken fortransportation and storage of dangerous or inflammable equipment.
      22.2.4 the date of "on board bill of lading" shall be deemed to be theactual delivery date of the respective equipment.
      22.2.5 not later than _________ days before the readiness of eachshipment,(1)the supplier shall notify the buyer by cable/telex/ fax ofthe following information:(a)contract number(b)date of readiness of the equipment(c)total volume(d)total gross weight(e)total number of packages(f)shipping port(g)name, total gross weight and measurement of each package of theover-sized or over-weight equipment(h)name and imo number of the dangerous or inflammable equipment;(2) at the same time the supplier shall submit to the buyer thefollowing documents, each in six (6)copies:
觉得本文对您有用,想收藏下来!方法很简单:请点击-〉